Horse Ranch Creek Road

HRCR

Project Delivery Method:  CM Multi-Prime
Project Budget:
Construction Start Date:  January 2010
Completion Date:  December 2013
Occupy Date:
Bond Series:  A

Scope/Summary: 

Construction of a two mile road connecting Pankey Rd with State Route 76 in Fallbrook ( North San Diego County) to serve the future North Education Center, as well as adjacent private residential and commercial developments.  Project included a two lane asphalt road to San Diego County road standards, new utility services (electrical, water, communication, natural gas), and a one mile landscaping area along NEC property.

Sustainable Features:

  • Use of recycled materials for road base
  • All fill areas utilized native materials onsite (no imported soils)
  • Critical open space, natural habitat was protected and enhanced, and will remain native in perpetuity

Project Team:

  • Construction Manager: Balfour Beatty Construction
  • Civil Engineer: RBF
  • Electrical/Mechanical Engineer: San Diego Gas & Electric
  • Landscape Architect: Jeremy Franzini
  • Construction Manager: Chris Miller
  • Prop M Construction Manager: John Philipps