{"id":584,"date":"2019-02-14T08:54:09","date_gmt":"2019-02-14T16:54:09","guid":{"rendered":"https:\/\/www.palomar.edu\/propm\/?page_id=584"},"modified":"2024-11-25T11:40:20","modified_gmt":"2024-11-25T19:40:20","slug":"fallbrook-education-center-interim-village","status":"publish","type":"page","link":"https:\/\/www.palomar.edu\/propm\/fallbrook-education-center-interim-village\/","title":{"rendered":"Fallbrook Education Center Interim Village"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter\" src=\"https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2019\/02\/North-Education-Center-May-31-6.jpg\" alt=\"View of the Fallbrook Education Center campus \" width=\"875\" height=\"582\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter\" src=\"https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2019\/02\/North-Education-Center-May-31-5.jpg\" alt=\"Fallbrook Education Center buildings \" width=\"853\" height=\"567\" \/><\/p>\n<p><strong>Project Delivery Method:<\/strong> CM Multi-Prime<br \/>\n<strong>Project Cost:<\/strong> $29.8 million<br \/>\n<strong>Construction Start Date:<\/strong> \u00a0June\u00a02017<br \/>\n<strong>Completion Date:<\/strong> June 2018<br \/>\n<strong>Occupy Date:<\/strong> June 2018<br \/>\n<strong>Bond Series: <\/strong>C<\/p>\n<p><strong>Scope\/Summary:\u00a0 <\/strong><\/p>\n<p>Construction of 18 modular buildings of over 20,000 SF 4-story Interim Village to open the new Fallbrook Education Center.\u00a0 The Interim Village consists of modular buildings for Administration, Staff and Student Lounges and Meeting\/Study Rooms, Library, Science Labs, Computer Lab, and Classrooms.\u00a0 All roads, parking lots, and associated landscaping were constructed for current and future development.<\/p>\n<p><strong>Project Team:<\/strong><\/p>\n<ul>\n<li>Architect: HMC<\/li>\n<li>Construction Manager: Balfour-Beatty Construction.<\/li>\n<li>Civil Engineer: Masson &amp; Associates<\/li>\n<li>Electrical\/Mechanical Engineer: Johnson Consulting, P2S<\/li>\n<li>Structural Engineer: HMC<\/li>\n<li>Landscape Architect: Deneen Powell Atelier<\/li>\n<li>Construction &amp; Facilities Planning Manager:\u00a0Dennis Astl<\/li>\n<li>Prop M Construction Manager: John Philipps<\/li>\n<li>Furniture, Fixtures &amp; Equipment (FF&amp;E) Supervisor: Eileen Poole<\/li>\n<\/ul>\n<p><span class=\"embed-youtube\" style=\"text-align:center; display: block;\"><iframe loading=\"lazy\" class=\"youtube-player\" width=\"640\" height=\"360\" src=\"https:\/\/www.youtube.com\/embed\/w087yOJAnu4?version=3&#038;rel=1&#038;showsearch=0&#038;showinfo=1&#038;iv_load_policy=1&#038;fs=1&#038;hl=en-US&#038;autohide=2&#038;wmode=transparent\" allowfullscreen=\"true\" style=\"border:0;\" sandbox=\"allow-scripts allow-same-origin allow-popups allow-presentation allow-popups-to-escape-sandbox\"><\/iframe><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project Delivery Method: CM Multi-Prime Project Cost: $29.8 million Construction Start Date: \u00a0June\u00a02017 Completion Date: June 2018 Occupy Date: June 2018 Bond Series: C Scope\/Summary:\u00a0 Construction of 18 modular buildings of over 20,000 SF 4-story Interim Village to open the new Fallbrook Education Center.\u00a0 The Interim Village consists of modular buildings for Administration, Staff and&hellip; <a class=\"continue\" href=\"https:\/\/www.palomar.edu\/propm\/fallbrook-education-center-interim-village\/\">Continue Reading<span> Fallbrook Education Center Interim Village<\/span><\/a><\/p>\n","protected":false},"author":455,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"footnotes":""},"class_list":["post-584","page","type-page","status-publish","hentry"],"featured_image_src":null,"acf":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/P6Sp7k-9q","_links":{"self":[{"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/pages\/584","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/users\/455"}],"replies":[{"embeddable":true,"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/comments?post=584"}],"version-history":[{"count":5,"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/pages\/584\/revisions"}],"predecessor-version":[{"id":1315,"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/pages\/584\/revisions\/1315"}],"wp:attachment":[{"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/media?parent=584"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}