{"id":50,"date":"2015-08-19T15:44:10","date_gmt":"2015-08-19T22:44:10","guid":{"rendered":"https:\/\/www.palomar.edu\/propm\/?page_id=50"},"modified":"2024-11-12T11:50:00","modified_gmt":"2024-11-12T19:50:00","slug":"t-building-renovation","status":"publish","type":"page","link":"https:\/\/www.palomar.edu\/propm\/t-building-renovation\/","title":{"rendered":"T Building Renovation"},"content":{"rendered":"<p><strong>Project Delivery Method:\u00a0<\/strong>GMP<br \/>\n<strong>Project Budget:\u00a0<\/strong>$16 million<br \/>\n<strong>Construction Start Date:\u00a0<\/strong>Spring Semester 2012<br \/>\n<strong>Completion Date:\u00a0<\/strong>Fall Semester 2013<br \/>\n<strong>Occupy Date:<\/strong>\u00a0Spring Semester 2014<br \/>\n<strong>Bond Series: <\/strong>A<\/p>\n<p><strong>Scope\/Summary:\u00a0<\/strong><\/p>\n<p>Renovation and expansion of 30,000 SF existing T-Building to provide program needs for the Cabinet and Furniture Technology, Waste Water Management and Welding programs.<\/p>\n<p><strong>Sustainability Features:\u00a0<\/strong><\/p>\n<ul>\n<li>A combination of light colored paving and landscaping was used throughout the project site to promote the natural habitat, reduce heat island effect and to control\/treat stormwater runoff.<\/li>\n<li>Designing adaptive and indigenous plants into the landscaped areas and along pedestrian pathways aids in creating drought tolerant open space.<\/li>\n<li>The project performs 20% better than Title 24 through a combination of techniques such as: proper sizing of equipment, efficient building envelope design, occupancy sensors to control lighting levels, natural day lighting, and design of a PV ready roof.<\/li>\n<li>Efficient low flow water fixtures allow the building to achieve 20% water savings<\/li>\n<li>In specifying low-emitting materials for carpeting, casework, paints and other building materials, the project is able to achieve optimal indoor air quality.<\/li>\n<li>Recycled and regional content account for 10% of the building materials<\/li>\n<li>LEED certified.<\/li>\n<\/ul>\n<p><strong>Project Team:<\/strong><\/p>\n<ul>\n<li>Architect: HMC<\/li>\n<li>Construction Manager: Gilbane<\/li>\n<li>Civil Engineer: Masson &amp; Associates<\/li>\n<li>Electrical\/Mechanical Engineer: PBS, Johnson Electrical Consulting<\/li>\n<li>Structural Engineer: KPBS<\/li>\n<li>Landscape Architect: Van Dyke<\/li>\n<li>Construction Manager: Chris Miller<\/li>\n<li>Prop M Construction Manager:\u00a0Ralph Johnson<\/li>\n<li>Furniture, Fixtures &amp; Equipment Supervisor:\u00a0 Amy O&#8217;Brien<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Project Delivery Method:\u00a0GMP Project Budget:\u00a0$16 million Construction Start Date:\u00a0Spring Semester 2012 Completion Date:\u00a0Fall Semester 2013 Occupy Date:\u00a0Spring Semester 2014 Bond Series: A Scope\/Summary:\u00a0 Renovation and expansion of 30,000 SF existing T-Building to provide program needs for the Cabinet and Furniture Technology, Waste Water Management and Welding programs. Sustainability Features:\u00a0 A combination of light colored paving&hellip; <a class=\"continue\" href=\"https:\/\/www.palomar.edu\/propm\/t-building-renovation\/\">Continue Reading<span> T Building Renovation<\/span><\/a><\/p>\n","protected":false},"author":455,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"footnotes":""},"class_list":["post-50","page","type-page","status-publish","hentry"],"featured_image_src":null,"acf":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/P6Sp7k-O","_links":{"self":[{"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/pages\/50","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/users\/455"}],"replies":[{"embeddable":true,"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/comments?post=50"}],"version-history":[{"count":9,"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/pages\/50\/revisions"}],"predecessor-version":[{"id":1307,"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/pages\/50\/revisions\/1307"}],"wp:attachment":[{"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/media?parent=50"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}