{"id":48,"date":"2015-08-19T15:43:58","date_gmt":"2015-08-19T22:43:58","guid":{"rendered":"https:\/\/www.palomar.edu\/propm\/?page_id=48"},"modified":"2024-11-25T12:53:15","modified_gmt":"2024-11-25T20:53:15","slug":"escondido-education-center-reimaging","status":"publish","type":"page","link":"https:\/\/www.palomar.edu\/propm\/escondido-education-center-reimaging\/","title":{"rendered":"Escondido Education Center Reimaging"},"content":{"rendered":"<p><a href=\"https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2015\/11\/Escondido.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-230 aligncenter\" src=\"https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2015\/11\/Escondido-1024x640.jpg\" alt=\"Escondido\" width=\"640\" height=\"400\" srcset=\"https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2015\/11\/Escondido-1024x640.jpg 1024w, https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2015\/11\/Escondido-300x188.jpg 300w, https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2015\/11\/Escondido.jpg 1294w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2015\/11\/Escondido2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-231 size-large\" src=\"https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2015\/11\/Escondido2-1024x686.jpg\" alt=\"View of outdoor tables at the Escondido Center campus \" width=\"1024\" height=\"686\" srcset=\"https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2015\/11\/Escondido2-1024x686.jpg 1024w, https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2015\/11\/Escondido2-300x201.jpg 300w, https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2015\/11\/Escondido2.jpg 1295w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/p>\n<p><strong>Project Delivery Method:<\/strong>\u00a0 CM Multi-Prime<br \/>\n<strong>Project Budget:<\/strong>\u00a0 $15.7 Million<br \/>\n<strong>Construction Start Date:<\/strong><br \/>\n<strong>Completion Date:\u00a0<\/strong> July 2013<br \/>\n<strong>Occupy Date:<\/strong> August 2013<br \/>\n<strong>Bond Series:<\/strong> A<\/p>\n<p><strong>Scope\/Summary:\u00a0 <\/strong><\/p>\n<p>Due to the age and outdated architecture of the buildings and facilities being a former retail center, a cosmetic \u201cfacelift\u201d was necessary to enhance the quality of the learning environment and help draw neighboring community to the Education Center.\u00a0 The entire exterior was transformed to a streamlined , contemporary image, the interior was remodeled for better efficiency, and rooms were updated with new paint and flooring for creating a welcoming atmosphere.\u00a0 Parking lots were reconfigured and repaved for more efficient Staff and Student parking, circulation and safety.<\/p>\n<p><strong>Sustainable Features:<\/strong><\/p>\n<ul>\n<li>Pervious asphalt for direct percolation of parking lot surface runoff<\/li>\n<li>Outdoor patio areas for student relaxation and collaboration<\/li>\n<li>Tinted solar and graffiti resistant window film<\/li>\n<li>High efficiency restroom fixtures.<\/li>\n<\/ul>\n<p><strong>Project Team:<\/strong><\/p>\n<ul>\n<li>Architect: LPA, Inc.<\/li>\n<li>Construction Manager: C.W.\u00a0Driver<\/li>\n<li>Civil Engineer: LPA, Inc.<\/li>\n<li>Electrical\/Mechanical Engineer: LPA, Inc.<\/li>\n<li>Structural Engineer: LPA, Inc.<\/li>\n<li>Landscape Architect: LPA, Inc.<\/li>\n<li>Construction Manager: Chris Miller<\/li>\n<li>Prop M Construction Manager: John Philipps<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Project Delivery Method:\u00a0 CM Multi-Prime Project Budget:\u00a0 $15.7 Million Construction Start Date: Completion Date:\u00a0 July 2013 Occupy Date: August 2013 Bond Series: A Scope\/Summary:\u00a0 Due to the age and outdated architecture of the buildings and facilities being a former retail center, a cosmetic \u201cfacelift\u201d was necessary to enhance the quality of the learning environment and&hellip; <a class=\"continue\" href=\"https:\/\/www.palomar.edu\/propm\/escondido-education-center-reimaging\/\">Continue Reading<span> Escondido Education Center Reimaging<\/span><\/a><\/p>\n","protected":false},"author":455,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"footnotes":""},"class_list":["post-48","page","type-page","status-publish","hentry"],"featured_image_src":null,"acf":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/P6Sp7k-M","_links":{"self":[{"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/pages\/48","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/users\/455"}],"replies":[{"embeddable":true,"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/comments?post=48"}],"version-history":[{"count":6,"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/pages\/48\/revisions"}],"predecessor-version":[{"id":1332,"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/pages\/48\/revisions\/1332"}],"wp:attachment":[{"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/media?parent=48"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}