{"id":46,"date":"2015-08-19T15:43:48","date_gmt":"2015-08-19T22:43:48","guid":{"rendered":"https:\/\/www.palomar.edu\/propm\/?page_id=46"},"modified":"2024-11-25T11:38:14","modified_gmt":"2024-11-25T19:38:14","slug":"baseball-field-relocation","status":"publish","type":"page","link":"https:\/\/www.palomar.edu\/propm\/baseball-field-relocation\/","title":{"rendered":"Baseball Field Relocation"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter\" src=\"https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2019\/02\/PMCpano209-1024x527.jpg\" alt=\"View of the baseball field on campus \" width=\"723\" height=\"372\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter\" src=\"https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2019\/02\/Baseball-Field-1024x683.jpg\" alt=\"View of the baseball field from the dugout \" width=\"690\" height=\"460\" \/><\/p>\n<p><strong>Project Delivery Method:<\/strong> CMAR<br \/>\n<strong>Project Budget:<\/strong> $10.3 million<br \/>\n<strong>Construction Start Date:<\/strong> May\u00a02014<br \/>\n<strong>Completion Date:<\/strong> September\u00a02015<br \/>\n<strong>Occupy Date:<\/strong> September\u00a02015<br \/>\n<strong>Bond Series:<\/strong> A<\/p>\n<p><strong>Scope\/Summary:<\/strong><\/p>\n<p>New baseball field with stadium seating, dugouts, restrooms, press box, and lighted batting cages and bullpens.<\/p>\n<p><strong>Sustainable Features:<\/strong><\/p>\n<ul>\n<li>Natural grass playing surface<\/li>\n<li>Artificial turf<\/li>\n<li>LED batting cage &amp; bullpen lighting<\/li>\n<li>Carved into hillside maintaining surrounding natural habitat and vegetation<strong><br \/>\n<\/strong><\/li>\n<\/ul>\n<p><strong>Awards:\u00a0 <\/strong><\/p>\n<ul>\n<li>Statewide Educational Wrap Up Program (SEWUP) Safety Award<\/li>\n<\/ul>\n<p><strong>Project Team:<\/strong><\/p>\n<ul>\n<li>Architect: Davy Architecture<\/li>\n<li>Construction Manager: Swinerton Builders<\/li>\n<li>Civil Engineer: SB&amp;O, INC<\/li>\n<li>Electrical\/Mechanical Engineer: BSE Engineering, Inc.<\/li>\n<li>Structural Engineer: KNA\u00a0Consulting Engineers, Inc.<\/li>\n<li>Landscape Architect: Howard Associates<\/li>\n<li>Construction &amp; Facilities Planning Manager:\u00a0Dennis Astl<\/li>\n<li>Prop M Construction Manager: John Philipps<\/li>\n<li>Furniture, Fixtures &amp; Equipment (FF&amp;E) Supervisor: Eileen Poole<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Project Delivery Method: CMAR Project Budget: $10.3 million Construction Start Date: May\u00a02014 Completion Date: September\u00a02015 Occupy Date: September\u00a02015 Bond Series: A Scope\/Summary: New baseball field with stadium seating, dugouts, restrooms, press box, and lighted batting cages and bullpens. Sustainable Features: Natural grass playing surface Artificial turf LED batting cage &amp; bullpen lighting Carved into hillside&hellip; <a class=\"continue\" href=\"https:\/\/www.palomar.edu\/propm\/baseball-field-relocation\/\">Continue Reading<span> Baseball Field Relocation<\/span><\/a><\/p>\n","protected":false},"author":455,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"footnotes":""},"class_list":["post-46","page","type-page","status-publish","hentry"],"featured_image_src":null,"acf":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/P6Sp7k-K","_links":{"self":[{"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/pages\/46","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/users\/455"}],"replies":[{"embeddable":true,"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/comments?post=46"}],"version-history":[{"count":11,"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/pages\/46\/revisions"}],"predecessor-version":[{"id":1313,"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/pages\/46\/revisions\/1313"}],"wp:attachment":[{"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/media?parent=46"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}