{"id":44,"date":"2015-08-19T15:43:34","date_gmt":"2015-08-19T22:43:34","guid":{"rendered":"https:\/\/www.palomar.edu\/propm\/?page_id=44"},"modified":"2024-11-25T12:48:28","modified_gmt":"2024-11-25T20:48:28","slug":"theater-renovationaddition","status":"publish","type":"page","link":"https:\/\/www.palomar.edu\/propm\/theater-renovationaddition\/","title":{"rendered":"Theater Renovation\/Addition"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter\" src=\"https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2019\/02\/PMC215-1024x575.jpg\" alt=\"View of the theater building on campus \" width=\"632\" height=\"355\" \/><\/p>\n<p style=\"text-align: center\"><a href=\"https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2017\/05\/Brubeck-Theatre-Southeast.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-499 size-large\" src=\"https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2017\/05\/Brubeck-Theatre-Southeast-1024x652.jpg\" alt=\"Rendering of the theater building \" width=\"1024\" height=\"652\" srcset=\"https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2017\/05\/Brubeck-Theatre-Southeast-1024x652.jpg 1024w, https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2017\/05\/Brubeck-Theatre-Southeast-300x191.jpg 300w, https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2017\/05\/Brubeck-Theatre-Southeast-768x489.jpg 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/p>\n<p style=\"text-align: center\"><a href=\"https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2017\/05\/Brubeck-Theatre-Southwest.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-500 size-large\" src=\"https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2017\/05\/Brubeck-Theatre-Southwest-1024x512.jpg\" alt=\"\" width=\"640\" height=\"320\" srcset=\"https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2017\/05\/Brubeck-Theatre-Southwest-1024x512.jpg 1024w, https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2017\/05\/Brubeck-Theatre-Southwest-300x150.jpg 300w, https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2017\/05\/Brubeck-Theatre-Southwest-768x384.jpg 768w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/a><\/p>\n<p style=\"text-align: center\"><a href=\"https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2017\/05\/Brubeck-Theatre-Interior.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-498 size-large\" src=\"https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2017\/05\/Brubeck-Theatre-Interior-1024x781.jpg\" alt=\"Rendering of the indoor renovations to the theater building \" width=\"1024\" height=\"781\" srcset=\"https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2017\/05\/Brubeck-Theatre-Interior-1024x781.jpg 1024w, https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2017\/05\/Brubeck-Theatre-Interior-300x229.jpg 300w, https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2017\/05\/Brubeck-Theatre-Interior-768x586.jpg 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/p>\n<p><strong>Project Delivery Method:\u00a0<\/strong>CM Multi-Prime<br \/>\n<strong>Project Cost:\u00a0<\/strong>$22.7 million<br \/>\n<strong>Construction Start Date:\u00a0<\/strong>May 2011<br \/>\n<strong>Completion Date:\u00a0<\/strong>Spring 2013<br \/>\n<strong>Occupy Date:<\/strong>\u00a0Spring 2013<br \/>\n<strong>Bond Series:<\/strong> A<\/p>\n<p><strong>Scope\/Summary:\u00a0<\/strong><\/p>\n<p>This project constructed 9,500\u00a0ASF of new performance and lab space and completely remodeled the existing 28\u00a0 year old Theatre.\u00a0The energy efficient and sustainable building provides state of the art technical support and a safe and fully accessible space for the Performing Arts department and community groups.<\/p>\n<p><strong>Sustainability Features:<\/strong><\/p>\n<ul>\n<li>Savings by Design and Sustainable communities programs<\/li>\n<li>Beating Title 24<\/li>\n<li>Reuse of existing structure<\/li>\n<li>New HVAC plant serving both buildings<\/li>\n<li>Lighting renovation and controls<\/li>\n<li>Cool roof<\/li>\n<li>Day-lighting<\/li>\n<li>Building orientation to sun within constraints of existing building site<\/li>\n<li>Low flow plumbing fixtures<\/li>\n<\/ul>\n<p><strong>Project Team:<\/strong><\/p>\n<ul>\n<li>Architect: Mosher Drew<\/li>\n<li>Construction Manager:\u00a0Balfour Beatty<\/li>\n<li>Civil Engineer: Nasland Engineering<\/li>\n<li>Electrical\/Mechanical Engineer: MA\/ILA<\/li>\n<li>Structural Engineer: SDSE<\/li>\n<li>Landscape Architect: KTU+A<\/li>\n<li>Construction &amp; Facilities Planning Manager: Chris Miller<\/li>\n<li>Prop M Construction Manager: Ralph Johnson<\/li>\n<li>Furniture, Fixtures &amp; Equipment (FF&amp;E) Supervisor: Amy O&#8217;Brien<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Project Delivery Method:\u00a0CM Multi-Prime Project Cost:\u00a0$22.7 million Construction Start Date:\u00a0May 2011 Completion Date:\u00a0Spring 2013 Occupy Date:\u00a0Spring 2013 Bond Series: A Scope\/Summary:\u00a0 This project constructed 9,500\u00a0ASF of new performance and lab space and completely remodeled the existing 28\u00a0 year old Theatre.\u00a0The energy efficient and sustainable building provides state of the art technical support and a safe&hellip; <a class=\"continue\" href=\"https:\/\/www.palomar.edu\/propm\/theater-renovationaddition\/\">Continue Reading<span> Theater Renovation\/Addition<\/span><\/a><\/p>\n","protected":false},"author":455,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-44","page","type-page","status-publish","hentry"],"featured_image_src":null,"acf":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/P6Sp7k-I","_links":{"self":[{"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/pages\/44","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/users\/455"}],"replies":[{"embeddable":true,"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/comments?post=44"}],"version-history":[{"count":8,"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/pages\/44\/revisions"}],"predecessor-version":[{"id":1327,"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/pages\/44\/revisions\/1327"}],"wp:attachment":[{"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/media?parent=44"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}