{"id":420,"date":"2016-10-31T12:23:49","date_gmt":"2016-10-31T19:23:49","guid":{"rendered":"https:\/\/www.palomar.edu\/propm\/?page_id=420"},"modified":"2024-11-25T11:42:07","modified_gmt":"2024-11-25T19:42:07","slug":"early-childhood-education-lab-school","status":"publish","type":"page","link":"https:\/\/www.palomar.edu\/propm\/early-childhood-education-lab-school\/","title":{"rendered":"Early Childhood Education Lab School"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter\" src=\"https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2019\/02\/ECE-aerial.jpg\" alt=\"View of the Early Childhood Education Lab School\" width=\"934\" height=\"550\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter\" src=\"https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2019\/02\/ECELS_2016_Mar-8075-1-1024x678.jpg\" alt=\"Classroom inside the Early Childhood Education Lab \" width=\"801\" height=\"530\" \/><\/p>\n<p><strong>Project Delivery Method:<\/strong>\u00a0GMP<br \/>\n<strong>Project Budget:<\/strong> $17.1 million<br \/>\n<strong>Construction Start Date:<\/strong>\u00a0January 2015<br \/>\n<strong>Completion Date:<\/strong>\u00a0March 2016<br \/>\n<strong>Occupy Date:<\/strong>\u00a0March 2016<br \/>\n<strong>Bond Series:<\/strong>\u00a0A<\/p>\n<p><strong>Scope\/Summary:<\/strong><\/p>\n<p>This project will constructed a new\u00a0Early Childhood Education Lab School\u00a0at the northeast section of the campus, adjacent to the Arboretum. The new location will provides safe access to the Center with a convenient drop off area isolated from parking lots and general campus traffic flow. The project replaced three temporary buildings that have housed the Center for over 31 years. The existing buildings were demolished to make way for much needed student parking. Included in the project cost is the removal of the CDA, CDB and CDC Buildings.<\/p>\n<p><strong>Sustainable Features:<\/strong><\/p>\n<ul>\n<li>Storm water controls<\/li>\n<li>Light pollution reduction<\/li>\n<li>Water use reduction<\/li>\n<li>Water efficient landscape<\/li>\n<li>Optimal energy performance<\/li>\n<li>Onsite renewable energy<\/li>\n<li>Enhanced commissioning techniques<\/li>\n<li>Enhanced storage and collection of recyclables<\/li>\n<li>Increased ventilation<\/li>\n<li>Low emitting materials<\/li>\n<li>Daylight and views<\/li>\n<li>LEED Silver Certification<\/li>\n<\/ul>\n<p><strong>Project Team:<\/strong><\/p>\n<ul>\n<li>Architect: Davy Architecture<\/li>\n<li>Construction Manager: Swinerton Builders<\/li>\n<li>Civil Engineer: SB&amp;O, INC<\/li>\n<li>Electrical\/Mechanical Engineer: BSE Engineering, Inc.<\/li>\n<li>Structural Engineer: KNA\u00a0Consulting Engineers, Inc.<\/li>\n<li>Landscape Architect: Marum Partnership<\/li>\n<li>Construction &amp; Facilities Planning Manager:\u00a0Dennis Astl<\/li>\n<li>Prop M Construction Manager:\u00a0Ralph Johnson<\/li>\n<li>Furniture, Fixtures &amp; Equipment (FF&amp;E) Supervisor: Eileen Poole<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Project Delivery Method:\u00a0GMP Project Budget: $17.1 million Construction Start Date:\u00a0January 2015 Completion Date:\u00a0March 2016 Occupy Date:\u00a0March 2016 Bond Series:\u00a0A Scope\/Summary: This project will constructed a new\u00a0Early Childhood Education Lab School\u00a0at the northeast section of the campus, adjacent to the Arboretum. The new location will provides safe access to the Center with a convenient drop off&hellip; <a class=\"continue\" href=\"https:\/\/www.palomar.edu\/propm\/early-childhood-education-lab-school\/\">Continue Reading<span> Early Childhood Education Lab School<\/span><\/a><\/p>\n","protected":false},"author":455,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"footnotes":""},"class_list":["post-420","page","type-page","status-publish","hentry"],"featured_image_src":null,"acf":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/P6Sp7k-6M","_links":{"self":[{"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/pages\/420","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/users\/455"}],"replies":[{"embeddable":true,"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/comments?post=420"}],"version-history":[{"count":7,"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/pages\/420\/revisions"}],"predecessor-version":[{"id":1317,"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/pages\/420\/revisions\/1317"}],"wp:attachment":[{"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/media?parent=420"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}