{"id":241,"date":"2015-11-20T15:25:51","date_gmt":"2015-11-20T23:25:51","guid":{"rendered":"https:\/\/www.palomar.edu\/propm\/?page_id=241"},"modified":"2025-09-22T14:18:58","modified_gmt":"2025-09-22T21:18:58","slug":"librarylearning-resource-center-lrc","status":"publish","type":"page","link":"https:\/\/www.palomar.edu\/propm\/librarylearning-resource-center-lrc\/","title":{"rendered":"Library\/Learning Resource Center (LRC)"},"content":{"rendered":"<p style=\"text-align: center\"><a href=\"https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2015\/11\/LRC.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-234 size-large\" src=\"https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2015\/11\/LRC-1024x558.png\" alt=\"Library\/Learning Resource Center (LRC) \n\" width=\"1024\" height=\"558\" srcset=\"https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2015\/11\/LRC-1024x558.png 1024w, https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2015\/11\/LRC-300x164.png 300w, https:\/\/www.palomar.edu\/propm\/wp-content\/uploads\/sites\/60\/2015\/11\/LRC.png 1427w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/p>\n<p><iframe loading=\"lazy\" title=\"Palomar College Learning Resource Center\" src=\"https:\/\/player.vimeo.com\/video\/314631267?dnt=1&amp;app_id=122963\" width=\"500\" height=\"281\" frameborder=\"0\" allow=\"autoplay; fullscreen; picture-in-picture; clipboard-write\"><\/iframe><\/p>\n<p><strong>Project Delivery Method:<\/strong> CM At Risk<br \/>\n<strong>Project Cost:<\/strong> $67.3 million<br \/>\n<strong>Construction Start Date:<\/strong> \u00a0June\u00a02015<br \/>\n<strong>Completion Date:<\/strong> January 2019<br \/>\n<strong>Occupy Date:<\/strong> January 2019<br \/>\n<strong>Bond Series: <\/strong>C<\/p>\n<p><strong>Scope\/Summary:\u00a0 <\/strong><\/p>\n<p>Construction of a 85,000 SF 4-story Library and Learning Resource Center to replace current outdated facility.\u00a0 The new Library\/LRC consists of an expansive entry atrium, collaboration and group study in both private rooms and open areas, classrooms, training and meeting rooms, individual and group open lab tutoring, and a computer commons with both individual carrels and group settings, and Staff offices.<\/p>\n<p><strong>Sustainable Features:<\/strong><\/p>\n<ul>\n<li>Photovoltaic panels on roof to provide building electricity<\/li>\n<li>Project is pursuing LEED Gold Certification.<\/li>\n<\/ul>\n<p><strong>Awards:<\/strong><\/p>\n<ul>\n<li>Community College Facility Coalition (CCFC) Award of Merit<\/li>\n<\/ul>\n<p><strong>Project Team:<\/strong><\/p>\n<ul>\n<li>Architect: LPA, Inc.<\/li>\n<li>Construction Manager: Gilbane Building Co.<\/li>\n<li>Civil Engineer: LPA, Inc.<\/li>\n<li>Electrical\/Mechanical Engineer: LPA, Inc.<\/li>\n<li>Structural Engineer: LPA, Inc.<\/li>\n<li>Landscape Architect: LPA, Inc.<\/li>\n<li>Construction &amp; Facilities Planning Manager:\u00a0Dennis Astl<\/li>\n<li>Prop M Construction Manager: John Philipps<\/li>\n<li>Furniture, Fixtures &amp; Equipment (FF&amp;E) Supervisor: Eileen Poole<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Project Delivery Method: CM At Risk Project Cost: $67.3 million Construction Start Date: \u00a0June\u00a02015 Completion Date: January 2019 Occupy Date: January 2019 Bond Series: C Scope\/Summary:\u00a0 Construction of a 85,000 SF 4-story Library and Learning Resource Center to replace current outdated facility.\u00a0 The new Library\/LRC consists of an expansive entry atrium, collaboration and group study&hellip; <a class=\"continue\" href=\"https:\/\/www.palomar.edu\/propm\/librarylearning-resource-center-lrc\/\">Continue Reading<span> Library\/Learning Resource Center (LRC)<\/span><\/a><\/p>\n","protected":false},"author":455,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"footnotes":""},"class_list":["post-241","page","type-page","status-publish","hentry"],"featured_image_src":null,"acf":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/P6Sp7k-3T","_links":{"self":[{"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/pages\/241","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/users\/455"}],"replies":[{"embeddable":true,"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/comments?post=241"}],"version-history":[{"count":9,"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/pages\/241\/revisions"}],"predecessor-version":[{"id":1408,"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/pages\/241\/revisions\/1408"}],"wp:attachment":[{"href":"https:\/\/www.palomar.edu\/propm\/wp-json\/wp\/v2\/media?parent=241"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}