{"id":917,"date":"2017-08-30T11:20:44","date_gmt":"2017-08-30T18:20:44","guid":{"rendered":"https:\/\/www.palomar.edu\/news\/?p=917"},"modified":"2025-07-08T12:14:51","modified_gmt":"2025-07-08T19:14:51","slug":"maintenance-operations-construction-palomar","status":"publish","type":"post","link":"https:\/\/www.palomar.edu\/news\/maintenance-operations-construction-palomar\/","title":{"rendered":"New Maintenance and Operations Complex Under Construction"},"content":{"rendered":"<p><em>Rendering Courtesy of BNIM Architects<\/em><\/p>\n<p>SAN MARCOS, CA \u2013\u00a0 Construction has begun on a new Maintenance and Operations (M&amp;O) complex on Palomar College\u2019s San Marcos campus. The 28,000 square-foot complex will be located on the west side of the College, near the corner of Mission Road and Las Posas Road.<\/p>\n<p>With 28,000 square feet of space, the new set of buildings will replace the current Facilities department, which is now housed in eight separate buildings on the north side of campus. Noted for its energy-efficient design, the new facility is expected to have \u201cnet-zero\u201d readiness when completed.<\/p>\n<p>Palomar College Superintendent-President Dr. Joi Lin Blake said, \u201cThis new complex is truly state-of-the-art in terms of energy efficiency, and sets an example for the way all new buildings should be built.\u201d<\/p>\n<p>Level 10 Construction is the general contractor for the project, in collaboration with BNIM Architects. Mike Conroy, Vice President of Operations for Level 10 Construction\u2019s San Diego office, said \u201cWe believe that this project will have a major influence on how community colleges will view the long term financial benefits of incorporating sustainable design strategies into their future building programs.\u201d<\/p>\n<p>Dennis Astl, Palomar College Manager of Construction and Facilities Planning said, \u201cThe M&amp;O building will be the most \u2018green\u2019 or sustainable building ever built by the District. We plan to submit the project as part of the Living Building Challenge, sponsored by the International Living Future Institute (ILFI). We aim to achieve a rating of five out of seven \u2018petals,\u2019 which is one step above LEED and much more difficult to achieve.\u201d Astl said that if Palomar\u2019s M&amp;O project gets this rating, the college will likely be \u201cthe first community college building in the world to get petal certified.\u201d<\/p>\n<p>The Maintenance and Operations complex project is being funded with Proposition M general obligation bond funds. This $694 million bond was approved by District voters in November 2006. Expected completion date for this project is late spring 2018.<\/p>\n<p># # #<\/p>\n<p>Media Contacts:<br \/>\nMelinda Finn, Public Affairs Office, 760-744-1150 ext. 2365<br \/>\nLaura Gropen, Director, Public Affairs Office, 760-744-1150 x2152<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Rendering Courtesy of BNIM Architects SAN MARCOS, CA \u2013\u00a0 Construction has begun on a new Maintenance and Operations (M&amp;O) complex on Palomar College\u2019s San Marcos campus. The 28,000 square-foot complex will be located on the west side of the College, near the corner of Mission Road and Las Posas Road. With 28,000 square feet of&hellip; <a class=\"continue\" href=\"https:\/\/www.palomar.edu\/news\/maintenance-operations-construction-palomar\/\">\u00a0Continue Reading:<span> New Maintenance and Operations Complex Under Construction<\/span><\/a><\/p>\n","protected":false},"author":132,"featured_media":1425,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[19,23,14],"tags":[32],"class_list":["post-917","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-carousel","category-home","category-news","tag-construction"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction begins on Palomar&#039;s new maintenance\/operations complex<\/title>\n<meta name=\"description\" content=\"Palomar College broke ground on a new, 28,000 square-foot Maintenance and Operations (M&amp;O) complex at the main San Marcos campus.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.palomar.edu\/news\/maintenance-operations-construction-palomar\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction begins on Palomar&#039;s new maintenance\/operations complex\" \/>\n<meta property=\"og:description\" content=\"Palomar College broke ground on a new, 28,000 square-foot Maintenance and Operations (M&amp;O) complex at the main San Marcos campus.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.palomar.edu\/news\/maintenance-operations-construction-palomar\/\" \/>\n<meta property=\"og:site_name\" content=\"Palomar News\" \/>\n<meta property=\"article:published_time\" content=\"2017-08-30T18:20:44+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-07-08T19:14:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.palomar.edu\/news\/wp-content\/uploads\/sites\/50\/2017\/08\/Facilities-M-and-O-complex.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2400\" \/>\n\t<meta property=\"og:image:height\" content=\"1200\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Melinda Finn\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Melinda Finn\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/maintenance-operations-construction-palomar\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/maintenance-operations-construction-palomar\\\/\"},\"author\":{\"name\":\"Melinda Finn\",\"@id\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/#\\\/schema\\\/person\\\/a4c3dcca6b35dcb015eeb7f93206fe17\"},\"headline\":\"New Maintenance and Operations Complex Under Construction\",\"datePublished\":\"2017-08-30T18:20:44+00:00\",\"dateModified\":\"2025-07-08T19:14:51+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/maintenance-operations-construction-palomar\\\/\"},\"wordCount\":353,\"image\":{\"@id\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/maintenance-operations-construction-palomar\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/wp-content\\\/uploads\\\/sites\\\/50\\\/2017\\\/08\\\/Facilities-M-and-O-complex.jpg\",\"keywords\":[\"Construction\"],\"articleSection\":[\"Carousel\",\"Home\",\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/maintenance-operations-construction-palomar\\\/\",\"url\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/maintenance-operations-construction-palomar\\\/\",\"name\":\"Construction begins on Palomar's new maintenance\\\/operations complex\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/maintenance-operations-construction-palomar\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/maintenance-operations-construction-palomar\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/wp-content\\\/uploads\\\/sites\\\/50\\\/2017\\\/08\\\/Facilities-M-and-O-complex.jpg\",\"datePublished\":\"2017-08-30T18:20:44+00:00\",\"dateModified\":\"2025-07-08T19:14:51+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/#\\\/schema\\\/person\\\/a4c3dcca6b35dcb015eeb7f93206fe17\"},\"description\":\"Palomar College broke ground on a new, 28,000 square-foot Maintenance and Operations (M&O) complex at the main San Marcos campus.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/maintenance-operations-construction-palomar\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.palomar.edu\\\/news\\\/maintenance-operations-construction-palomar\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/maintenance-operations-construction-palomar\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/wp-content\\\/uploads\\\/sites\\\/50\\\/2017\\\/08\\\/Facilities-M-and-O-complex.jpg\",\"contentUrl\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/wp-content\\\/uploads\\\/sites\\\/50\\\/2017\\\/08\\\/Facilities-M-and-O-complex.jpg\",\"width\":2400,\"height\":1200,\"caption\":\"Rendering of new building on campus\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/maintenance-operations-construction-palomar\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"New Maintenance and Operations Complex Under Construction\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/#website\",\"url\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/\",\"name\":\"Palomar News\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/#\\\/schema\\\/person\\\/a4c3dcca6b35dcb015eeb7f93206fe17\",\"name\":\"Melinda Finn\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9c51b831747d7f7790faa6c41c32b7362d715c4457baa33e3f65e51bd8c4a8f1?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9c51b831747d7f7790faa6c41c32b7362d715c4457baa33e3f65e51bd8c4a8f1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9c51b831747d7f7790faa6c41c32b7362d715c4457baa33e3f65e51bd8c4a8f1?s=96&d=mm&r=g\",\"caption\":\"Melinda Finn\"},\"url\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/author\\\/mfinn\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction begins on Palomar's new maintenance\/operations complex","description":"Palomar College broke ground on a new, 28,000 square-foot Maintenance and Operations (M&O) complex at the main San Marcos campus.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.palomar.edu\/news\/maintenance-operations-construction-palomar\/","og_locale":"en_US","og_type":"article","og_title":"Construction begins on Palomar's new maintenance\/operations complex","og_description":"Palomar College broke ground on a new, 28,000 square-foot Maintenance and Operations (M&O) complex at the main San Marcos campus.","og_url":"https:\/\/www.palomar.edu\/news\/maintenance-operations-construction-palomar\/","og_site_name":"Palomar News","article_published_time":"2017-08-30T18:20:44+00:00","article_modified_time":"2025-07-08T19:14:51+00:00","og_image":[{"width":2400,"height":1200,"url":"https:\/\/www.palomar.edu\/news\/wp-content\/uploads\/sites\/50\/2017\/08\/Facilities-M-and-O-complex.jpg","type":"image\/jpeg"}],"author":"Melinda Finn","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Melinda Finn","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.palomar.edu\/news\/maintenance-operations-construction-palomar\/#article","isPartOf":{"@id":"https:\/\/www.palomar.edu\/news\/maintenance-operations-construction-palomar\/"},"author":{"name":"Melinda Finn","@id":"https:\/\/www.palomar.edu\/news\/#\/schema\/person\/a4c3dcca6b35dcb015eeb7f93206fe17"},"headline":"New Maintenance and Operations Complex Under Construction","datePublished":"2017-08-30T18:20:44+00:00","dateModified":"2025-07-08T19:14:51+00:00","mainEntityOfPage":{"@id":"https:\/\/www.palomar.edu\/news\/maintenance-operations-construction-palomar\/"},"wordCount":353,"image":{"@id":"https:\/\/www.palomar.edu\/news\/maintenance-operations-construction-palomar\/#primaryimage"},"thumbnailUrl":"https:\/\/www.palomar.edu\/news\/wp-content\/uploads\/sites\/50\/2017\/08\/Facilities-M-and-O-complex.jpg","keywords":["Construction"],"articleSection":["Carousel","Home","News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.palomar.edu\/news\/maintenance-operations-construction-palomar\/","url":"https:\/\/www.palomar.edu\/news\/maintenance-operations-construction-palomar\/","name":"Construction begins on Palomar's new maintenance\/operations complex","isPartOf":{"@id":"https:\/\/www.palomar.edu\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.palomar.edu\/news\/maintenance-operations-construction-palomar\/#primaryimage"},"image":{"@id":"https:\/\/www.palomar.edu\/news\/maintenance-operations-construction-palomar\/#primaryimage"},"thumbnailUrl":"https:\/\/www.palomar.edu\/news\/wp-content\/uploads\/sites\/50\/2017\/08\/Facilities-M-and-O-complex.jpg","datePublished":"2017-08-30T18:20:44+00:00","dateModified":"2025-07-08T19:14:51+00:00","author":{"@id":"https:\/\/www.palomar.edu\/news\/#\/schema\/person\/a4c3dcca6b35dcb015eeb7f93206fe17"},"description":"Palomar College broke ground on a new, 28,000 square-foot Maintenance and Operations (M&O) complex at the main San Marcos campus.","breadcrumb":{"@id":"https:\/\/www.palomar.edu\/news\/maintenance-operations-construction-palomar\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.palomar.edu\/news\/maintenance-operations-construction-palomar\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.palomar.edu\/news\/maintenance-operations-construction-palomar\/#primaryimage","url":"https:\/\/www.palomar.edu\/news\/wp-content\/uploads\/sites\/50\/2017\/08\/Facilities-M-and-O-complex.jpg","contentUrl":"https:\/\/www.palomar.edu\/news\/wp-content\/uploads\/sites\/50\/2017\/08\/Facilities-M-and-O-complex.jpg","width":2400,"height":1200,"caption":"Rendering of new building on campus"},{"@type":"BreadcrumbList","@id":"https:\/\/www.palomar.edu\/news\/maintenance-operations-construction-palomar\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.palomar.edu\/news\/"},{"@type":"ListItem","position":2,"name":"New Maintenance and Operations Complex Under Construction"}]},{"@type":"WebSite","@id":"https:\/\/www.palomar.edu\/news\/#website","url":"https:\/\/www.palomar.edu\/news\/","name":"Palomar News","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.palomar.edu\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.palomar.edu\/news\/#\/schema\/person\/a4c3dcca6b35dcb015eeb7f93206fe17","name":"Melinda Finn","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9c51b831747d7f7790faa6c41c32b7362d715c4457baa33e3f65e51bd8c4a8f1?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9c51b831747d7f7790faa6c41c32b7362d715c4457baa33e3f65e51bd8c4a8f1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9c51b831747d7f7790faa6c41c32b7362d715c4457baa33e3f65e51bd8c4a8f1?s=96&d=mm&r=g","caption":"Melinda Finn"},"url":"https:\/\/www.palomar.edu\/news\/author\/mfinn\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-04-11 04:16:18","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.palomar.edu\/news\/wp-json\/wp\/v2\/posts\/917","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.palomar.edu\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.palomar.edu\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.palomar.edu\/news\/wp-json\/wp\/v2\/users\/132"}],"replies":[{"embeddable":true,"href":"https:\/\/www.palomar.edu\/news\/wp-json\/wp\/v2\/comments?post=917"}],"version-history":[{"count":5,"href":"https:\/\/www.palomar.edu\/news\/wp-json\/wp\/v2\/posts\/917\/revisions"}],"predecessor-version":[{"id":9715,"href":"https:\/\/www.palomar.edu\/news\/wp-json\/wp\/v2\/posts\/917\/revisions\/9715"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.palomar.edu\/news\/wp-json\/wp\/v2\/media\/1425"}],"wp:attachment":[{"href":"https:\/\/www.palomar.edu\/news\/wp-json\/wp\/v2\/media?parent=917"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.palomar.edu\/news\/wp-json\/wp\/v2\/categories?post=917"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.palomar.edu\/news\/wp-json\/wp\/v2\/tags?post=917"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}