{"id":1802,"date":"2017-10-20T10:10:34","date_gmt":"2017-10-20T17:10:34","guid":{"rendered":"https:\/\/www.palomar.edu\/news\/?p=1802"},"modified":"2025-07-08T12:34:18","modified_gmt":"2025-07-08T19:34:18","slug":"north-education-center-groundbreaking","status":"publish","type":"post","link":"https:\/\/www.palomar.edu\/news\/north-education-center-groundbreaking\/","title":{"rendered":"Looking north: Palomar\u2019s Fallbrook site under way"},"content":{"rendered":"<p>Summer 2018 opening planned for North Education Center near Interstate 15 and Highway 76.<\/p>\n<p>FALLBROOK \u2014 As a fleet of heavy machinery began moving the first of more than 750,000 cubic yards of earth in preparation for a new Palomar College location this summer, commuters had a front-row seat, following the progress from Interstate 15 as bare land took on new contours.<\/p>\n<p>Some of the motorists stuck in rush-hour traffic on I-15 were Palomar\u2019s own\u2014students, faculty and staff who drive past the Fallbrook site to reach their classes or offices in San Marcos.<\/p>\n<p>Beginning next summer, the college will drastically reduce commute times for many who drive from Temecula and beyond to attend Palomar when the North Education Center opens its doors for the first time.<\/p>\n<p>In June 2018, when students begin arriving in Fallbrook, they will find a fully functional college center offering a range of classes in a brand new facility known as the \u201cInterim Village.\u201d<\/p>\n<p>The college officially broke ground at the Fallbrook site on Friday, Oct. 13, in a ceremony that included Luise\u00f1o prayers by members of the Pauma tribe, song and dance by the Cahuilla Bird Singers, and presentations by college and elected officials.<\/p>\n<p>\u201cWe have long been a partner in Fallbrook, with classes at Fallbrook High School,\u201d Palomar College Superintendent\/President Dr. Joi Blake said at the groundbreaking. \u201cWe also have many students who travel from Temecula and Murrieta to the San Marcos campus who will soon no longer have to travel as far down Interstate 15.\u201d<\/p>\n<div id=\"attachment_1814\" style=\"width: 2010px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-1814\" class=\"wp-image-1814 size-full\" src=\"https:\/\/www.palomar.edu\/news\/wp-content\/uploads\/sites\/50\/2017\/10\/Fallbrook-Center-Groundbreaking-8143.jpg\" alt=\"Palomar College banner hanging from construction equipment in a dirt field \" width=\"2000\" height=\"1325\" srcset=\"https:\/\/www.palomar.edu\/news\/wp-content\/uploads\/sites\/50\/2017\/10\/Fallbrook-Center-Groundbreaking-8143.jpg 2000w, https:\/\/www.palomar.edu\/news\/wp-content\/uploads\/sites\/50\/2017\/10\/Fallbrook-Center-Groundbreaking-8143-1080x716.jpg 1080w, https:\/\/www.palomar.edu\/news\/wp-content\/uploads\/sites\/50\/2017\/10\/Fallbrook-Center-Groundbreaking-8143-300x199.jpg 300w, https:\/\/www.palomar.edu\/news\/wp-content\/uploads\/sites\/50\/2017\/10\/Fallbrook-Center-Groundbreaking-8143-768x509.jpg 768w, https:\/\/www.palomar.edu\/news\/wp-content\/uploads\/sites\/50\/2017\/10\/Fallbrook-Center-Groundbreaking-8143-1024x678.jpg 1024w\" sizes=\"auto, (max-width: 2000px) 100vw, 2000px\" \/><p id=\"caption-attachment-1814\" class=\"wp-caption-text\">Palomar College groundbreaking, Friday, Oct. 13. Photos by Melinda Finn.<\/p><\/div>\n<p>Located northeast of the I-15\/Highway 76 intersection, half an hour north of the San Marcos campus, the North Education Center will continue to grow, both in terms of classes and facilities, after its 2018 opening.<\/p>\n<p>The first-phase Interim Village is planned as a complex of modular buildings, including two science labs, one computer lab, seven classrooms, a Library and Learning Resource Center, staff and student lounges, administration space, and restrooms. There will also be parking for 307 vehicles, as well as lighting and landscaping, when the site opens next summer.<\/p>\n<p>By 2020, the college plans to unveil permanent facilities with space for a growing student population from Fallbrook and Southwest Riverside County that is expected to choose the North Education Center because of its convenient location.<\/p>\n<p>Chris Hopp, President of the Associated Student Government at Palomar and a resident of Temecula, said that the commute to and from San Marcos\u2014a trip that students like him make every day\u2014can be daunting.<\/p>\n<p>\u201cDepending on the day and the traffic, the trip can easily take over two hours each way and is routinely over one hour,\u201d said Hopp, who braves the route five days a week. \u201cThat is 10 to 20 hours per week spent in traffic just to attend Palomar. The North Center, on the other hand, is half the commute or less.\u201d<\/p>\n<p>According to Assistant Superintendent\/Vice President of Instructional Services Jack Kahn, the Interim Village will begin in summer 2018 by providing 25 of the most in-demand general education classes, including speech, psychology, health and history, among others.<\/p>\n<div id=\"attachment_1833\" style=\"width: 2010px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-1833\" class=\"wp-image-1833 size-full\" src=\"https:\/\/www.palomar.edu\/news\/wp-content\/uploads\/sites\/50\/2017\/10\/North-Education-Center-1.jpg\" alt=\"A rendering of Palomar College's North Education Center campus \" width=\"2000\" height=\"1125\" srcset=\"https:\/\/www.palomar.edu\/news\/wp-content\/uploads\/sites\/50\/2017\/10\/North-Education-Center-1.jpg 2000w, https:\/\/www.palomar.edu\/news\/wp-content\/uploads\/sites\/50\/2017\/10\/North-Education-Center-1-1080x608.jpg 1080w, https:\/\/www.palomar.edu\/news\/wp-content\/uploads\/sites\/50\/2017\/10\/North-Education-Center-1-300x169.jpg 300w, https:\/\/www.palomar.edu\/news\/wp-content\/uploads\/sites\/50\/2017\/10\/North-Education-Center-1-768x432.jpg 768w, https:\/\/www.palomar.edu\/news\/wp-content\/uploads\/sites\/50\/2017\/10\/North-Education-Center-1-1024x576.jpg 1024w\" sizes=\"auto, (max-width: 2000px) 100vw, 2000px\" \/><p id=\"caption-attachment-1833\" class=\"wp-caption-text\">A rendering of Palomar College&#8217;s North Education Center, due to open in summer 2018.<\/p><\/div>\n<p>In years to come, college officials plan to add a variety of other programs for the North Education Center. Public safety, agriculture, hospitality and veterinary science are among the courses currently being discussed, according to Kahn.<\/p>\n<p>\u201cI think it\u2019s fantastic,\u201d said Kahn, who is overseeing the development of educational programs at the North Education Center. \u201cIt\u2019s very convenient for our community in the north, and also provides a beautiful environment for teaching and learning as well as access to a unique environmental setting for unique programming.\u201d<\/p>\n<p>For the students who will be able to shave at least an hour, and up to two, off of their daily commutes, the prospect of a northern location is exciting.<\/p>\n<p>\u201cThroughout my time at Palomar, I have based my class choices around traffic,\u201d said Hopp. \u201cThe addition of a choice to attend a campus closer to my home would give me more free time to devote to my studies, the ASG, and my life outside of school.\u201d<\/p>\n<p>Funded by Proposition M, a $694 million general obligation bond, the North Education Center site was purchased in 2007 for approximately $38 million. The budget for the Interim Village is approximately $20 million. Another project funded by Prop. M, the college\u2019s South Education Center in Rancho Bernardo, is also set to open next summer.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Summer 2018 opening planned for North Education Center near Interstate 15 and Highway 76. FALLBROOK \u2014 As a fleet of heavy machinery began moving the first of more than 750,000 cubic yards of earth in preparation for a new Palomar College location this summer, commuters had a front-row seat, following the progress from Interstate 15&hellip; <a class=\"continue\" href=\"https:\/\/www.palomar.edu\/news\/north-education-center-groundbreaking\/\">\u00a0Continue Reading:<span> Looking north: Palomar\u2019s Fallbrook site under way<\/span><\/a><\/p>\n","protected":false},"author":10413,"featured_media":1828,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[19,9,23,18],"tags":[32,44],"class_list":["post-1802","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-carousel","category-features","category-home","category-slider","tag-construction","tag-north-education-center"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Looking north: Palomar\u2019s Fallbrook site under way - Palomar News<\/title>\n<meta name=\"description\" content=\"Officials break ground and plan a summer 2018 opening for North Education Center near Interstate 15 and Highway 76 in Fallbrook.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.palomar.edu\/news\/north-education-center-groundbreaking\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Looking north: Palomar\u2019s Fallbrook site under way - Palomar News\" \/>\n<meta property=\"og:description\" content=\"Officials break ground and plan a summer 2018 opening for North Education Center near Interstate 15 and Highway 76 in Fallbrook.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.palomar.edu\/news\/north-education-center-groundbreaking\/\" \/>\n<meta property=\"og:site_name\" content=\"Palomar News\" \/>\n<meta property=\"article:published_time\" content=\"2017-10-20T17:10:34+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-07-08T19:34:18+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.palomar.edu\/news\/wp-content\/uploads\/sites\/50\/2017\/10\/Fallbrook-Site-earth-work-fall2017-5039-1024x684.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"684\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Pfingsten, Tom\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Pfingsten, Tom\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/north-education-center-groundbreaking\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/north-education-center-groundbreaking\\\/\"},\"author\":{\"name\":\"Pfingsten, Tom\",\"@id\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/#\\\/schema\\\/person\\\/38478049641ec4b9154ceafe0647a2c4\"},\"headline\":\"Looking north: Palomar\u2019s Fallbrook site under way\",\"datePublished\":\"2017-10-20T17:10:34+00:00\",\"dateModified\":\"2025-07-08T19:34:18+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/north-education-center-groundbreaking\\\/\"},\"wordCount\":761,\"image\":{\"@id\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/north-education-center-groundbreaking\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/wp-content\\\/uploads\\\/sites\\\/50\\\/2017\\\/10\\\/Fallbrook-Site-earth-work-fall2017-5039.jpg\",\"keywords\":[\"Construction\",\"North Education Center\"],\"articleSection\":[\"Carousel\",\"Features\",\"Home\",\"Slider\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/north-education-center-groundbreaking\\\/\",\"url\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/north-education-center-groundbreaking\\\/\",\"name\":\"Looking north: Palomar\u2019s Fallbrook site under way - Palomar News\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/north-education-center-groundbreaking\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/north-education-center-groundbreaking\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/wp-content\\\/uploads\\\/sites\\\/50\\\/2017\\\/10\\\/Fallbrook-Site-earth-work-fall2017-5039.jpg\",\"datePublished\":\"2017-10-20T17:10:34+00:00\",\"dateModified\":\"2025-07-08T19:34:18+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/#\\\/schema\\\/person\\\/38478049641ec4b9154ceafe0647a2c4\"},\"description\":\"Officials break ground and plan a summer 2018 opening for North Education Center near Interstate 15 and Highway 76 in Fallbrook.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/north-education-center-groundbreaking\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.palomar.edu\\\/news\\\/north-education-center-groundbreaking\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/north-education-center-groundbreaking\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/wp-content\\\/uploads\\\/sites\\\/50\\\/2017\\\/10\\\/Fallbrook-Site-earth-work-fall2017-5039.jpg\",\"contentUrl\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/wp-content\\\/uploads\\\/sites\\\/50\\\/2017\\\/10\\\/Fallbrook-Site-earth-work-fall2017-5039.jpg\",\"width\":2000,\"height\":1335,\"caption\":\"Dirt construction site with machinery and vehicles\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/north-education-center-groundbreaking\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Looking north: Palomar\u2019s Fallbrook site under way\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/#website\",\"url\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/\",\"name\":\"Palomar News\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/#\\\/schema\\\/person\\\/38478049641ec4b9154ceafe0647a2c4\",\"name\":\"Pfingsten, Tom\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f9783a57a21bb15e96e120e3a61977e4d216b6b0141f53c142c85954086286de?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f9783a57a21bb15e96e120e3a61977e4d216b6b0141f53c142c85954086286de?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f9783a57a21bb15e96e120e3a61977e4d216b6b0141f53c142c85954086286de?s=96&d=mm&r=g\",\"caption\":\"Pfingsten, Tom\"},\"url\":\"https:\\\/\\\/www.palomar.edu\\\/news\\\/author\\\/tpfingsten\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Looking north: Palomar\u2019s Fallbrook site under way - Palomar News","description":"Officials break ground and plan a summer 2018 opening for North Education Center near Interstate 15 and Highway 76 in Fallbrook.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.palomar.edu\/news\/north-education-center-groundbreaking\/","og_locale":"en_US","og_type":"article","og_title":"Looking north: Palomar\u2019s Fallbrook site under way - Palomar News","og_description":"Officials break ground and plan a summer 2018 opening for North Education Center near Interstate 15 and Highway 76 in Fallbrook.","og_url":"https:\/\/www.palomar.edu\/news\/north-education-center-groundbreaking\/","og_site_name":"Palomar News","article_published_time":"2017-10-20T17:10:34+00:00","article_modified_time":"2025-07-08T19:34:18+00:00","og_image":[{"width":1024,"height":684,"url":"https:\/\/www.palomar.edu\/news\/wp-content\/uploads\/sites\/50\/2017\/10\/Fallbrook-Site-earth-work-fall2017-5039-1024x684.jpg","type":"image\/jpeg"}],"author":"Pfingsten, Tom","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Pfingsten, Tom","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.palomar.edu\/news\/north-education-center-groundbreaking\/#article","isPartOf":{"@id":"https:\/\/www.palomar.edu\/news\/north-education-center-groundbreaking\/"},"author":{"name":"Pfingsten, Tom","@id":"https:\/\/www.palomar.edu\/news\/#\/schema\/person\/38478049641ec4b9154ceafe0647a2c4"},"headline":"Looking north: Palomar\u2019s Fallbrook site under way","datePublished":"2017-10-20T17:10:34+00:00","dateModified":"2025-07-08T19:34:18+00:00","mainEntityOfPage":{"@id":"https:\/\/www.palomar.edu\/news\/north-education-center-groundbreaking\/"},"wordCount":761,"image":{"@id":"https:\/\/www.palomar.edu\/news\/north-education-center-groundbreaking\/#primaryimage"},"thumbnailUrl":"https:\/\/www.palomar.edu\/news\/wp-content\/uploads\/sites\/50\/2017\/10\/Fallbrook-Site-earth-work-fall2017-5039.jpg","keywords":["Construction","North Education Center"],"articleSection":["Carousel","Features","Home","Slider"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.palomar.edu\/news\/north-education-center-groundbreaking\/","url":"https:\/\/www.palomar.edu\/news\/north-education-center-groundbreaking\/","name":"Looking north: Palomar\u2019s Fallbrook site under way - Palomar News","isPartOf":{"@id":"https:\/\/www.palomar.edu\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.palomar.edu\/news\/north-education-center-groundbreaking\/#primaryimage"},"image":{"@id":"https:\/\/www.palomar.edu\/news\/north-education-center-groundbreaking\/#primaryimage"},"thumbnailUrl":"https:\/\/www.palomar.edu\/news\/wp-content\/uploads\/sites\/50\/2017\/10\/Fallbrook-Site-earth-work-fall2017-5039.jpg","datePublished":"2017-10-20T17:10:34+00:00","dateModified":"2025-07-08T19:34:18+00:00","author":{"@id":"https:\/\/www.palomar.edu\/news\/#\/schema\/person\/38478049641ec4b9154ceafe0647a2c4"},"description":"Officials break ground and plan a summer 2018 opening for North Education Center near Interstate 15 and Highway 76 in Fallbrook.","breadcrumb":{"@id":"https:\/\/www.palomar.edu\/news\/north-education-center-groundbreaking\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.palomar.edu\/news\/north-education-center-groundbreaking\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.palomar.edu\/news\/north-education-center-groundbreaking\/#primaryimage","url":"https:\/\/www.palomar.edu\/news\/wp-content\/uploads\/sites\/50\/2017\/10\/Fallbrook-Site-earth-work-fall2017-5039.jpg","contentUrl":"https:\/\/www.palomar.edu\/news\/wp-content\/uploads\/sites\/50\/2017\/10\/Fallbrook-Site-earth-work-fall2017-5039.jpg","width":2000,"height":1335,"caption":"Dirt construction site with machinery and vehicles"},{"@type":"BreadcrumbList","@id":"https:\/\/www.palomar.edu\/news\/north-education-center-groundbreaking\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.palomar.edu\/news\/"},{"@type":"ListItem","position":2,"name":"Looking north: Palomar\u2019s Fallbrook site under way"}]},{"@type":"WebSite","@id":"https:\/\/www.palomar.edu\/news\/#website","url":"https:\/\/www.palomar.edu\/news\/","name":"Palomar News","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.palomar.edu\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.palomar.edu\/news\/#\/schema\/person\/38478049641ec4b9154ceafe0647a2c4","name":"Pfingsten, Tom","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/f9783a57a21bb15e96e120e3a61977e4d216b6b0141f53c142c85954086286de?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f9783a57a21bb15e96e120e3a61977e4d216b6b0141f53c142c85954086286de?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f9783a57a21bb15e96e120e3a61977e4d216b6b0141f53c142c85954086286de?s=96&d=mm&r=g","caption":"Pfingsten, Tom"},"url":"https:\/\/www.palomar.edu\/news\/author\/tpfingsten\/"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-04-12 05:36:42","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.palomar.edu\/news\/wp-json\/wp\/v2\/posts\/1802","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.palomar.edu\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.palomar.edu\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.palomar.edu\/news\/wp-json\/wp\/v2\/users\/10413"}],"replies":[{"embeddable":true,"href":"https:\/\/www.palomar.edu\/news\/wp-json\/wp\/v2\/comments?post=1802"}],"version-history":[{"count":6,"href":"https:\/\/www.palomar.edu\/news\/wp-json\/wp\/v2\/posts\/1802\/revisions"}],"predecessor-version":[{"id":9723,"href":"https:\/\/www.palomar.edu\/news\/wp-json\/wp\/v2\/posts\/1802\/revisions\/9723"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.palomar.edu\/news\/wp-json\/wp\/v2\/media\/1828"}],"wp:attachment":[{"href":"https:\/\/www.palomar.edu\/news\/wp-json\/wp\/v2\/media?parent=1802"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.palomar.edu\/news\/wp-json\/wp\/v2\/categories?post=1802"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.palomar.edu\/news\/wp-json\/wp\/v2\/tags?post=1802"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}