{"id":1425,"date":"2018-03-07T07:26:24","date_gmt":"2018-03-07T15:26:24","guid":{"rendered":"https:\/\/www.palomar.edu\/pages\/businessservices\/?page_id=1425"},"modified":"2018-03-07T08:46:55","modified_gmt":"2018-03-07T16:46:55","slug":"cm-17-18-01-nec-01-g","status":"publish","type":"page","link":"https:\/\/www.palomar.edu\/businessservices\/cm-17-18-01-nec-01-g\/","title":{"rendered":"CM-17-18-01-NEC-01-G"},"content":{"rendered":"<h2><strong>North Education Center Interim Village Communications and Security Project<\/strong><\/h2>\n\n<table id=\"tablepress-47\" class=\"tablepress tablepress-id-47 tbody-has-connected-cells\">\n<tbody class=\"row-striping row-hover\">\n<tr class=\"row-1\">\n\t<td class=\"column-1\">Type of Project:<\/td><td colspan=\"4\" class=\"column-2\">The project consists of All copper and optical fiber cabling to create complete phone and data systems on the site and in the temporary modular buildings at the new North Education Center campus, including but not limited to cabinets, racks, patch panels and cords, terminations, all cabling and terminations.  All hardware and cabling for the video surveillance system throughout the site and campus. <\/td>\n<\/tr>\n<tr class=\"row-2\">\n\t<td class=\"column-1\">Project  Documents:<\/td><td colspan=\"4\" class=\"column-2\"><a href=\"https:\/\/www.palomar.edu\/businessservices\/wp-content\/uploads\/sites\/38\/2018\/03\/BID-Doc-CM-17-18-01-NEC-01-G.pdf\">BID Documents<\/a><br \/>\n<br \/>\nDrawings \u2013 <br \/>\nDocument 01330, 01335, 01340; <br \/>\nSpecifications \u2013 <br \/>\nDocument 01430, 01435, 01440; <br \/>\nDistrict Standards \u2013<br \/>\nDocument 01445, 01450; <br \/>\nVideo Surveillance \u2013 <br \/>\nDocument 01455<br \/>\n<a href=\"https:\/\/bbcus.egnyte.com\/fl\/1QvMkYU9zt\">https:\/\/bbcus.egnyte.com\/fl\/1QvMkYU9zt<\/a><br \/>\n<a href=\"https:\/\/www.palomar.edu\/businessservices\/wp-content\/uploads\/sites\/38\/2018\/03\/Bid-Results-NEC-BP-G.pdf\">Bid Results<\/a><\/td>\n<\/tr>\n<tr class=\"row-3\">\n\t<td class=\"column-1\">Project Stage:<\/td><td class=\"column-2\">Awarded<\/td><td class=\"column-3\"><\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td>\n<\/tr>\n<tr class=\"row-4\">\n\t<td class=\"column-1\">\"Mandatory\"  Conference\/ Walkthrough:<\/td><td colspan=\"3\" class=\"column-2\">A MANDATORY pre-bid conference shall be held on Wednesday, March 14, 2018 at 1:00PM at the Balfour Beatty construction trailer onsite at 35090 Horse Ranch Creek Road, Fallbrook, CA 92028.  Attendance is MANDATORY.<br \/>\n<a href=\"https:\/\/www.palomar.edu\/businessservices\/wp-content\/uploads\/sites\/38\/2018\/03\/Mandatory-Sign-In-Sheet-Bid-Package-G.pdf\">Mandatory Sign-In Sheet <\/a><\/td><td class=\"column-5\"><\/td>\n<\/tr>\n<tr class=\"row-5\">\n\t<td class=\"column-1\">Prequalification Required<\/td><td class=\"column-2\">Contractors bidding on this scope must be prequalified by Palomar College.<br \/>\n<a href=\"https:\/\/www.palomar.edu\/businessservices\/contractor-pre-qualification-process\/\">Prequalification Process<\/a><\/td><td class=\"column-3\"><\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td>\n<\/tr>\n<tr class=\"row-6\">\n\t<td class=\"column-1\">Addenda:<\/td><td class=\"column-2\">Addenda #<\/td><td class=\"column-3\">Issued On<\/td><td class=\"column-4\">Title<\/td><td class=\"column-5\">Document<\/td>\n<\/tr>\n<tr class=\"row-7\">\n\t<td class=\"column-1\"><\/td><td class=\"column-2\">1<\/td><td class=\"column-3\">3\/23\/18<\/td><td class=\"column-4\">Addendum #1<\/td><td class=\"column-5\"><a href=\"https:\/\/www.palomar.edu\/businessservices\/wp-content\/uploads\/sites\/38\/2018\/03\/Addendum-1-with-attachments-A-B-CM-17-18-01-NEC-01-G.pdf\">Addendum<\/a><\/td>\n<\/tr>\n<tr class=\"row-8\">\n\t<td class=\"column-1\">Closing Date:<\/td><td colspan=\"2\" class=\"column-2\">March 29, 2018, no later than 2:00 p.m.<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td>\n<\/tr>\n<tr class=\"row-9\">\n\t<td class=\"column-1\">Document Delivery Location:<\/td><td colspan=\"3\" class=\"column-2\">Office of Contract Services<br \/>\nRoom A-130, Administration Bldg.<br \/>\n1140 West Mission Road<br \/>\nSan Marcos, CA 92069<\/td><td class=\"column-5\"><a href=\"http:\/\/www.palomar.edu\/businessservices\/files\/2016\/04\/CampusMapA10.pdf\">Campus Map<\/a><\/td>\n<\/tr>\n<tr class=\"row-10\">\n\t<td class=\"column-1\">Contact Information:<\/td><td colspan=\"4\" class=\"column-2\">Debbi Claypool, Contract Services, 760-744-1150 ext. 2129 \/ <a href=\"mailto:dclaypool@palomar.edu\">dclaypool@palomar.edu<\/a><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n\n","protected":false},"excerpt":{"rendered":"<p>North Education Center Interim Village Communications and Security Project<\/p>\n","protected":false},"author":414,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-1425","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.palomar.edu\/businessservices\/wp-json\/wp\/v2\/pages\/1425","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.palomar.edu\/businessservices\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.palomar.edu\/businessservices\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.palomar.edu\/businessservices\/wp-json\/wp\/v2\/users\/414"}],"replies":[{"embeddable":true,"href":"https:\/\/www.palomar.edu\/businessservices\/wp-json\/wp\/v2\/comments?post=1425"}],"version-history":[{"count":2,"href":"https:\/\/www.palomar.edu\/businessservices\/wp-json\/wp\/v2\/pages\/1425\/revisions"}],"predecessor-version":[{"id":1433,"href":"https:\/\/www.palomar.edu\/businessservices\/wp-json\/wp\/v2\/pages\/1425\/revisions\/1433"}],"wp:attachment":[{"href":"https:\/\/www.palomar.edu\/businessservices\/wp-json\/wp\/v2\/media?parent=1425"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}