T Building – New Storage Buildings Project
Type of Project: | The project consists of the construction of two storage buildings and one fabrication building, foundations and rock removal as required, a new retaining wall and associated site improvements, infill of wall opening in adjacent existing T-Building, and fire alarm connection to existing T-Building. | |||
Project Documents: | Bid 102-18 Drawings Staging Diagrams Specifications |
|||
Prequalification Required | Contractors bidding on this scope must be prequalified by Palomar College. Prequalification Process | |||
Project Stage: | Withdrawal | |||
"Mandatory" Conference/ Walkthrough: | A MANDATORY pre-bid conference shall be held on Tuesday, January 30, 2018 at 2:00 PM at the RS-Bldg., Room 5, on the San Marcos campus, 1140 West Mission Road, San Marcos, CA 92069. Attendance is MANDATORY. Mandatory Job Walk Sign in sheet | |||
Addenda: | Addenda # | Issued On | Title | Document |
1 | 01/18/18 | Addendum #1 | Addendum #1 | |
Closing Date: | February 21, 2018, no later than 3:00 p.m. | |||
Document Delivery Location: | Contract Services Room A-130, Administration Bldg. 1140 West Mission Road San Marcos, CA 92069 | Campus Map | ||
Contact Information: | Debbi Claypool, Contract Services, 760-744-1150 ext. 2129 / dclaypool@palomar.edu |