Project Detail – BID CM-11-12-HUM-XX
Multi-Prime Delivery Method Bid: New Construction : Palomar College Humanities
& Teaching Learning Center
|
Type of Document: |
Humanities Bldg: New construction and associated site improvements
for a 3-story, 90,898sf steel frame classroom building for the Humanities Department including classrooms,
faculty offices and mechanical basement area. Teaching Learning Center (TLC) : New construction of a single
story 6,600 sf classroom building complete with raised access flooring, offices and conference rooms. Estimated
value for both buildings $29.1M. |
| Project Documents: |
Bid Packages: 01 Concrete, Rebar, SWPPP, Asphalt Paving, Striping, Waterproofing
&
Masonry; 02 Structural Steel, Misc. Steel, Metal Decking; 03 Metal Studs, Drywall, Plaster, Insulation,
Doors & Hardware, Painting & Elevators; 04 Millwork; 05 Roofing, Roof Hatches, Skylights; 06 Sheet Metal,
Composite Wall Panels & Seismic Joints; 07 Glass/Glazing
& Rain Screen System; 08 Ceramic Tile; 09 Finish
Flooring (Carpet, VCT & Sheet Vinyl); 10 Access Flooring; 11 Acoustic Ceilings
& Metal Ceilings; 12
Specialties (Fire Extinguishers, Fencing, Projection Screens, Whiteboards, Tackboards, Toilet Partitions
&
Accessories, Demountable Partitions); 13 Signage; 14 Window Shades; 15 Fire Sprinklers; 16 Plumbing
& Wet and
Dry Site Utilities; 17 HVAC, Controls, Hydronic Piping; 18 Test
& Balance; 19 Electric & Photovoltaic System;
20 Low Voltage/Data; 21 Earthwork; 22 Landscape & Irrigation; 23 Final Cleaning; 24 SurveyG |
Main Campus Map |
| Bid Documents/Plans/ Specifications: |
Bid documents, plans & specifications may be purchased at A/E Scantech,
7150 Engineer Road, San Diego, CA 92111 or contact Scantech at (858) 495-0727. Plans are
available for "viewing only" at the District's Facilities office, please call Donna Renner to
make an appointment (760) 744-1150 ext. 3020. Each bidder will be responsible for the cost of
purchasing the bid documents, plans & specifications.
Front End Document |
| Project Stage: |
Awarded
Bid Results
Awarded Contractors List |
Mandatory Conference/ Walkthrough: |
Mandatory pre-bid conferences/Job Walks shall be held on July 20, 2011 and July 26, 2011
at 9:00 a.m., Governing Board Room (SSC-1), San Marcos campus, 1140 West Mission Road, San Marcos CA 92069.
Sign-in Sheet |
| Addenda: |
Addenda # |
Issued On |
Title |
Document |
| |
|
|
|
| |
|
|
|
| Closing Date: |
August 18,
2011 @ 2:00 PM |
Document Delivery Location: |
Governing Boardroom, Room SSC-1, Student Services
Center 1140 W. Mission Road San Marcos, CA 92069 |
Main Campus Map |
| Contact Information: |
Barnhart-Balfour Beatty:
Dennis Astl, Sr. Project Mgr. (858) 717-0246 Michael
Lugo Thompson, Project Mgr., (760) 699-1818 |
|

|
|